8 April 2025
S&P 5005048.42-150.64 (-3.0%)
Lithium15.0- 0.09 (-1.00%)
Nickel14483.25+ 43.25 (+0.00%)
“BARU’s flagship asset—the Sangihe Gold Project—is being fast-tracked to production and should begin cash-flowing as early as Q2 of 2021,”