Pure Gold is a development and exploration story out of the High-Grade Gold Capital of the World—the Red Lake Mining Camp of northwestern Ontario. The company’s Madsen deposit, aka the PureGold Mine, is considered the highest grade development-stage project in Canada.
Pure Gold (PGM.T) – (PUR.LSE) – (LRTNF.OTC)
- 359.23 million shares outstanding;
- $229.91M market cap based on its last trade at $0.64
Pure Gold’s resource at Red Lake currently stands at 2.1 million ounces at 8.9 g/t Au Indicated and 500k ounces at 7.7 g/t Au Inferred.
Just over a year ago, the company tabled a positive feasibility study (FS) based on a portion of the above resource block—3.5 Mt at 9.0 g/t containing 1.0 million ounces. These reserves serve as the foundation for a host of robust economics over a 12-year mine life (FS details further down the page).
“The Madsen Red Lake ore body is an exceptional foundation on which to build a gold mining company. With Probable Mineral Reserves of 3.5 Mt at 9.0 g/t containing 1.0 million ounces of gold included in a Mineral Resource of 7,196,000 Indicated tonnes grading 8.9 g/t gold for 2,063,000 ounces of gold and 1,880,000 Inferred tonnes grading 7.7 g/t gold for 467,000 ounces of gold, the Madsen Red Lake Gold Project is the highest grade development stage gold deposit in Canada and will be in the top 8 percentile globally when in production.”
The Feasibility Study
- Probable Mineral Reserves of 3.5 Mt at 9.0 g/t containing 1.0 million ounces of gold;
- Low initial capital requirement of $95 million including a 9% contingency;
- Mine life of 12.2 years with a 13 month pre-production period;
- Peak annual production of approximately 125,000 ounces with average annual gold production in years 3 through 7 of approximately 102,000 ounces;
- Life of mine (LOM) direct operating cash cost estimated at US$607 per ounce of gold recovered;
LOM all in sustaining cash cost estimated at US$787 per ounce of gold recovered; - Pre-tax NPV5% and IRR of $353 million and 43% respectively with a 3.0 year payback of initial capital;
- After-tax NPV5% and IRR of $247 million and 36% respectively with a 3.4 year payback of initial capital.
This economic study is anchored by a $1,275 gold price (gold is currently trading north of $1640 as I type).
Just for shits n giggles, if we apply a $1,500 gold price to Madsen, the after-tax NPV rises to $560M and the IRR jumps to 51%.
Other considerations: the price of oil has crashed in recent weeks. Since energy is a big cost driver for a miner, lower oil prices mean lower operational expenditures (OPEX). Also, gold priced in Canadian dollars is near an all-time historic high—trading at roughly $2,300 as I type.
Equally important, the company has a good relationship with the local Wabauskang and Lac Seul First Nation, where a Project Agreement was signed and implemented last summer. This lays the foundation for a seamless transition, from explorer to mine builder.
A major chunk of coin was raised last summer—a $47.5M equity financing that saw Eric Sprott wade in big.
On August 7, 2019, the company dropped the following piece of news:
They have the funds they need. The mine is under construction. The first gold pour is expected before the year is out.
The timing of this high-grade mine couldn’t be better—gold’s underlying fundamentals are extremely compelling.
“And we’re only just getting started“.
Main Street – where the gold is
If you’re in Red Lake, you want to be on Main Street, on the Balmer Assemblage (green areas highlighted below), specifically, along the deep crustal breaks (where green meets yellow). These are the conduits that concentrate gold mineralization in the Red Lake camp.
Newmont-Gold (NGT.T) controls the northern half of Main Street, Pure Gold controls the south.
The map below shows a cross-section of the subsurface layers running through Main Street—Pure Gold’s Madsen mine is on the left, Newmont-Goldcorp’s mine(s) on the right.
Viewing Newmont-Goldcorp’s deposits as an analog, the company uses this image to demonstrate the depth potential on their side of Main Street.
Newmont-Goldcorp has mined down to a depth of 2.5 kilometers. Pure Gold’s current reserves bottom out at 1.2 kilometers. Both projects share the same rocks—the same structure, the same geological timing. It’s possible Pure Gold really is “only just getting started.”
You may or may not know that the No. 3 shaft (extreme right, above map) was the ‘High-Grade’ zone that gave rise to the multi-billion dollar mining behemoth once known as Goldcorp (now Newmont-Goldcorp). Roughly 6 million high-grade ounces were mined out of that one zone alone.
The company has a good feel for the region’s subsurface layers having delineated a pronounced, elongated +7 kilometer southwest-northeast mineralized trend. This bit of geological sleuthing led to the discovery of additional near-surface zones—Russet South, Fork, and Wedge—all of which are part of one semi-continuous coherent gold system.
October 1, 2019 press release:
Note the (fat) drill intercepts along the various zones highlighted below.
Russet South, Fork, and Wedge represent the next phase of development for the company. With an additional 210k ounces of high-grade material, these new zones could extend the mine life another 3.7 years.
The economics underpinning these new discoveries demonstrate the potential to add approximately $51 million to the project’s after-tax NPV.
Transformative Growth
Getting back to the depth potential at Madsen, the following presentation, featuring Pure Gold CEO Darin Labrenz, examines the possibility of mineralization extending below the limits of the current reserve base at 1.2 kilometers depth (fast forward to the 5:50 mark if you’re anxious and wanna cut to the chase):
“We see potential here for the next three to five million ounces sitting right below the bottom of the reserve“.
Based on recent success with the drill bit, the company dropped the following headline a few months back:
Newsflow from ongoing drilling has yielded some spectacular results, too numerous to highlight here. The company’s news channel reveals all—follow the headlines beginning July 31, 2019.
Follow the Leaders
Eric Sprott, Rob McEwen, Anglogold Ashanti, and Newmont-Goldcorp own >30% of Pure Gold’s outstanding shares. Management and directors own 4%. Institutions own another 16%.
The Pure Gold team, with an enviable track record of creating shareholder value, is simply top-shelf.
The Virus
Re the COVID-19 situation, on March 20 the company stated:
“Development activities at the Pure Gold Red Lake Mine continue to operate normally, with no significant impact to date beyond the implementation of additional education and safety measures.”
Final Thought
Pure Gold’s soon-to-be-producing mine, and 47 square kilometers of highly prospective terra firma, make this a compelling shortlist candidate. This one has endgame potential.
Scrolled out across the top of the company’s project overview page, referring to the Madsen Red Lake Mine and Starratt-Olsen Mine (two past producers on the property), the following:
Turns out, when they abandoned these mines, they’d barely scratched the surface. (They left the real prize behind).
END